Our process:

  1. We investigate your park through google earth, the site map and other information.

  2. We make a “version 0” design, based on our standardized wifisite poles.

  3. We visit your location to verify our design, go over installation options, discuss possible buy or lease options.

  4. We will finalize the design and produce our quote for your park.

Usual installation process:

  1. Poles will be shipped to your location

  2. We will prepare/configure all equipment

  3. Your Campground/RV Park will be added to our central wifisite management system.

  4. At your site we will decide, together with you, the definite location of the poles.

  5. You drill the holes for the poles.

  6. We will mount all equipment on the poles and place the poles.

  7. You connect power cable to the nearest pedestal.

  8. We will install our controller

  9. Testing and instructions.